HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The design of LNG and NG follows the design and acceptance construction specifications

2021-11-01View Original

Thread Content

I would like to ask the experts: What are the design and acceptance construction specifications followed in the design of LNG and NG? What is the typical flow velocity in pipes?
Reply #22021-11-04
\"Design Code for Natural Gas Liquefaction Plants\" GB51261-2019, \"Code for Fire Protection Design of Oil and Gas Engineering Projects\" GB50183-2004, \"Design Code for Urban Gas\" GB50028-2020, \"Code for Fire Protection Design of Buildings\" GB50016-2014 (2018 edition);
Reply #32021-11-04
Different locations for LNG result in different implementation standards.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.