Compliance of total voltage drop for the renovation project (general layout)

2023-10-30View Original

Thread Content

There is an existing renovation project: the original main substation (66KV/10KV) and the unused Class D factory building are in the same structure. It is now intended to make use of this Class D factory building, with its fire protection classification remaining unchanged; How to plan? Discussion questions: 1. Can a plant-wide step-down transformer be installed in a Class D factory building? 2. How can the above diagram meet the requirements of petrochemical regulations and building codes without making major adjustments?
Reply #22023-11-10
It’s unlikely, unless you demolish the Class D factory building.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.