Thread Content
Tender for EPC general contracting of the plant-wide system engineering for Guoneng Xinjiang Coal-to-Gas Co., Ltd.’s 2 billion cubic meters per year coal-to-natural gas project in Zhundong **The scope of the plant-wide system engineering for the Energy Group’s 2 billion cubic meters per year coal-to-natural gas project includes the entire plant’s process and thermal pipeline networks, the plant’s flare systems, the plant’s comprehensive automation system, the plant’s external power supply systems, the plant’s telecommunications systems, the central laboratory (installation works), and the central control room (installation works). Responsible for the detailed design, procurement, and general construction management of the entire plant system for **Energy Group’s 2 billion cubic meters per year coal-to-natural gas project in Zhundong. This includes the design, procurement, and construction of all aspects related to the plant’s systems, such as processes, static equipment, dynamic equipment, layout planning, pipelines, instrumentation and automation systems, electrical systems, telecommunications, civil engineering (structures/buildings, excluding the central laboratory and control room), HVAC systems, fire protection measures, analysis and testing services, metrology and inspection activities, water supply and drainage systems, safety and environmental protection measures, as well as occupational health and safety considerations. The responsible party is also in charge of all tasks related to unit testing, mechanical completion, intermediate handovers, delivery acceptance, special inspections, and final project acceptance. Additionally, technical guidance and support services are provided during stages such as joint testing, commissioning with feedstock, actual operation, and performance evaluation.
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs Achieved from 2935 to 2025! The first phase of pipeline-laying work for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HCBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale basalt steel material deep-sea aquaculture floating platform was successfully launched between 2025 and 2937. https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (Hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: HaiChuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 30-megawatt-class pure hydrogen gas turbine came online between 2040 and 2025. https://bbs.hcbbs.com/thread-5709894-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Pilot-scale success achieved for the 2941-2025 high-temperature pure-oxygen pressurized bubbling fluidized-bed biomass gasification technology unit (referred to as the “Contess furnace”) https://bbs.hcbbs.com/thread-5709917-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2942-2025: China’s first domestically produced 300-megawatt-class heavy-duty gas turbine put into operation https://bbs.hcbbs.com/thread-5709928-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2929 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))