Thread Content
On January 23, 2026, an announcement was issued for the preliminary survey bidding of the Dalian Petrochemical (Xizhongdao) integrated refining and chemical project. Basic project information: The feedstock is designed to be a mixture of “70% Russian crude oil + 30% Saudi heavy crude oil”, and the facility has the capacity to process 100% Russian crude oil. Initially, the project processes Russian crude oil exclusively, with the crude oil being transported to the plant via pipelines. Construct a chemical-type refinery with an annual capacity of 10 million tons (utilizing some of the existing process units and equipment at Dalian Petrochemical), a facility for the production of 1.2 million tons of ethylene and other low-carbon olefins derived from it, as well as systems for oil storage and transportation, utility services, auxiliary facilities, and off-site projects. According to the plan, for a considerable period in the future, this project will use oil transported from Russia as raw material; the construction of 2 heavy oil processing units (solvent deasphalting unit and heavy oil hydrogen production unit) as well as a crude oil terminal with a capacity of 300,000 tons will be postponed ; In the later stage, construction will be carried out in a timely manner depending on the crude oil resources available, in order to meet the requirements of the plant configuration for the designed crude oil processing scenario of \"70% Russian oil + 30% Saudi heavy oil\". The scope of the bidding includes: organizing the preliminary survey for the Dalian Petrochemical (Xizhongdao) integrated refining and chemical project (excluding the accompanying docks), preparing survey technical documents in accordance with laws, regulations, **standards, industry requirements, corporate guidelines, and those set by relevant authorities), and providing various design documents necessary for the project’s approval, implementation, and operation. Bid section division: 2 bid sections. Bid Section 1: The refinery area and the area in front of the plant, including the refinery unit area west of the plant’s central axis, the raw material and intermediate tank areas, the product tank areas, the wastewater treatment systems, the elevated flares, the thermal units, etc., as well as the management area in front of the plant. A total of 715 drill holes were drilled, with an estimated penetration depth of 42,066 meters. Bid Section 2: The chemical processing area, including the chemical processing unit zone to the east of the plant’s central axis, the chemical intermediate tank area, the entire plant’s warehouses and chemical storage areas, the warehousing and transportation area, as well as related utility systems such as air separation and air compression units, the main power station, circulating water systems, and surface flares, plus the areas designated for energy storage; this section does not include the management area in front of the plant. A total of 649 drill holes were drilled, with an estimated footage of 41,564 meters.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2997 to 2026: Domestic high-performance carbon fiber ZA55GC enters the core supply chain of domestic large aircraft https://bbs.hcbbs.com/thread-5712466-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2999–2026: Lunan Chemical’s world’s first 3,000-ton OMB coal gasification furnace has been operating continuously, safely and stably for over 350 days https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712515 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711445 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first set of horizontal polycondensers for nylon 66, independently designed and manufactured by Tianhua Institute between 2026 and 2026, were successfully used in the 100,000-ton/year nylon 66 production facility at Liaoyang Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712094 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Ocean New Materials. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711129 (Source: Haichuan Chemical Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Inconsistent Installation Directions of Pipe Bolts and Excessively Long Exposure Length of Bolts https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711719 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Release Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711046 (Source: Haichuan Chemical Industry Forum (HCBBS))