Thread Content
From January 27 to 30, the overall design review meeting for the 800,000 tons per year coal-to-olefins upgrade demonstration project of Sinopec Great Wall Energy Chemical (Inner Mongolia) Co., Ltd. was held in Hohhot, Inner Mongolia. The meeting adopted a combination of review sessions and on-site inspections to conduct a comprehensive and systematic professional evaluation of the project’s overall design. Relevant departments of Sinopec Group, Sinopec Yanshan Petrochemical, Sinopec Ningbo Engineering Co., Ltd., Sinopec Engineering Construction Co., Ltd., and Sinopec Project Management Company – a total of 5 entities – attended the meeting. The conference invited 37 experts from organizations such as Tianchen Engineering Company, Shanghai Engineering Company, Guangzhou Engineering Company, the General Station for Engineering Quality Supervision, and Nanjing Engineering Company to form an evaluation panel, which conducted a thorough review of the project’s overall design and issued evaluation comments. Sinopec’s 800,000-ton/year coal-to-olefins upgrading demonstration project in Dalu has been approved for construction by Sinopec Corporation through the document titled \"Approval on the Feasibility Study Report for Sinopec Inner Mongolia Energy Chemicals’ 800,000-ton/year Coal-to-Olefins Upgrading Demonstration Project\" (Sinopec Corp. Document No. [2025]4). The project involves the construction of a 2.26-million-ton/year coal-to-methanol plant (including gasification, purification, methanol synthesis, sulfur recovery, etc.), a 2.26-million-ton/year MTO plant (including OCC), 350,000 tons/year of polyethylene, 450,000 tons/year of polypropylene, 100,000 tons/year of EVA/LDPE, as well as supporting utilities and auxiliary facilities such as air separation units and IGCC thermal power plants.
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Which company’s project approval was used to purchase this project? The Daliu Park originally did not have Sinopec’s MTO project.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 3001 to 2025, the Beijing Aerospace Power Research Institute developed China’s first polyolefin crushing and feeding machine, which has now been put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712691 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Disruptive technological breakthroughs from 2030 to 2026! Shanghai converts wet waste into green methanol, achieving a carbon reduction rate that far exceeds EU standards. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712693 (Source: Huchuan Chemicals Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】CGN’s 8.6-meter molten salt tank-type collectors from 2030 to 2025: breakthroughs in high aperture, high concentration ratios, and high-performance molten salt heating systems https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712784 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first industrial demonstration plant for high-pressure methane-carbon dioxide dry reforming was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712818 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The first of its kind within the refining and chemical processing sector, ZHLI Company’s 1-million-ton-per-year closed-system waste gas treatment project for delayed coking, was successfully completed and accepted in terms of mechanical requirements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713019 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The first of its kind within the refining and chemical processing sector, ZHLI Company’s 1-million-ton-per-year closed-system waste gas treatment project for delayed coking, was successfully completed and accepted in terms of mechanical requirements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713019 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Spring Festival Teahouse】Old items seen upon returning to one’s hometown – do you recognize them? (16)--Warm memories of winter in the south https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712746 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first gigawatt-class AEM film production line went into mass production from 2030 to 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5713037 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))