HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Requirements design for a pilot project

2026-03-18View Original

Thread Content

1. Theme: Co-synthesis of new materials using industrial solid waste gypsum and power plant flue gas. 2. Covers an area of 5 mu. 3. Achievements: The process package is prepared in accordance with SPMP-STD-EM2001, while the construction details are provided at the level required by the construction drawings. The results must be stamped with the seal of the design institute in East China.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.