HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Piping Valve Technical Edition – Daily Question on Common Piping Errors】20170806

2017-08-06View Original

Thread Content

Discussion on Common Piping Errors 021: Which of the following designs (the piping design for the discharge outlet at the bottom of the container in the diagram) is correct? A. B. Answer: B. If a fixed-bed reactor does not have dedicated ports for catalyst loading and unloading, a pair of flanges should be installed on the inlet and outlet pipelines to allow for the removal of these pipelines in order to load or unload the catalyst.
Reply #22017-08-06
I’m not sure which one is correct; if it were me, I would arrange the piping according to method A

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.