HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In the chemical production operation procedures, there are emergency plans for power outages, water supply issues, and instrument air shortages

2018-08-08View Original

Thread Content

How to write it? Experts, please give some guidance. Thank you
Reply #22018-08-08
Job SOPs should be systematically reflected
Reply #32018-08-09
1. Verify that the feed source (reactant) is completely isolated to ensure that no reaction occurs with the feed. 2. Verify that the heat source (steam) is completely turned off. 3. Inspect the site for any leaks or abnormalities. 4. Have some of the chain protection mechanisms been executed as configured?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.