HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

If the design agency is changed midway, how is the workload of the design agency calculated?

2018-08-31View Original

Thread Content

If the design agency is changed midway, how should the workload done by the previous design agency be calculated?
Reply #22018-08-31
There are specified milestones in the contract; alternatively, quotes can also be obtained based on the milestone-related quotation documents or the finished product drawings provided by the client.
Reply #32018-08-31
As stipulated in the contract; if there is no such stipulation, it shall be based on the quotation documents for each milestone or the final design drawings received by the owner.
Reply #42018-08-31
Based on the previous connections from the design institute, verify whether the drawings produced by that institute are correct.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.