HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Feasibility study stage: building area

2018-11-22View Original

Thread Content

I would like to ask everyone: how is the building area to be returned to the process design determined during the feasibility study phase? There isn’t enough time at that stage to create layout drawings, and it’s possible that even flowcharts aren’t fully prepared. So how is this building area determined?
Reply #22018-11-23
Based on basic functions and estimated potential needs.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.