Plan for the pipeline corridor to pass through the oil depot gate

2019-05-07View Original

Thread Content

Excuse me, there is a row of pipe galleries passing through the gate of the oil depot. What is the best way to proceed when passing through that gate? Above ground or buried? If above ground, what height is appropriate? Thank you!
Reply #22019-05-07
Generally, the clear height of utility tunnels crossing roads is determined with a long-term perspective in mind; the clear height on some main roads is 12 meters. For crossing between oil tank farm gates, only the height of the truck crane needs to be considered; 6–8 meters is sufficient.
Reply #32019-05-08
It’s still overhead; it will cause problems in the future if buried
Reply #42019-06-11
It must be a suspended cable tray bridge; its height depends on the height of the vehicles that pass under the warehouse doors

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.