HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problem with the unloading crane hose!

2019-06-05View Original

Thread Content

Article 6.4.2 of the \"Code for Fire Protection Design of Petrochemical Enterprises\" GB 50160-2008 (2018 edition) states that \"for loading liquids of Class A1, B, and C1, submersible loading nozzles shall be used.\" Compared with the previous version of the code, the requirement regarding unloading nozzles has been removed; does this mean that certain specific types of materials require the use of nozzles during unloading, while other materials do not need such nozzles?
Reply #22019-06-26
For print books, this entry is “loading and unloading”; please verify again
Reply #32019-07-01
Thank you! The revised text mentions a loading crane pipe, while the official standards refer to loading and unloading equipment!
Reply #42019-08-15
Later, a corrigendum was published in the print version as well; it can be found here: http://www.jhpress.com/View/News/NewsView.aspx?id=26
Reply #52020-06-29
As the original poster said, are there certain types of media for which dip pipes are used during unloading, while other media do not require such dip pipes?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.