HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Weird ground wire

2019-07-14View Original

Thread Content

It wasn’t connected before; it was required to be connected during the rectification process. It’s likely that it won’t pass the inspection
Reply #22019-07-14
It’s not very standardized, but it’s still necessary to use a megohmmeter to determine whether the standard is met.
Reply #32019-07-16
It’s better to follow the standards; passing the inspections is one thing, but it also ensures one’s own safety

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.