HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Differences between the Contract Signing Regulations for Chemical Installation Projects and the Petrochemical Regulations

2020-08-14View Original

Thread Content

Are there any differences in the installation fees? Are there different requirements regarding construction quality? I’m not sure exactly what the differences are and what impacts they might have
Reply #22020-08-14
The \"Code for Fire Protection Design of Buildings\" and the \"Code for Fire Protection Design of Petrochemical Enterprises\" are design codes commonly used in chemical engineering design. The \"Code for Fire Protection Design of Buildings\" (GB50016) is abbreviated as \"Building Code\", while the \"Code for Fire Protection Design of Petrochemical Enterprises\" (GB50160) is abbreviated as \"Petrochemical Code\". “It is crucial to select “building codes” and “petrochemical codes” appropriately in the design process. The responsibility of applying standards correctly in chemical engineering design is of utmost importance. There has long been significant interest in how to properly apply these two standards in the design of new, renovated, and expanded projects in chemical enterprises. There have been several approaches to the proper use of these two standards: one is to choose the standard based on its degree of strictness, that is, to design according to the standard that is the most stringent ; Secondly, it depends on whether the medium in question is a raw material, intermediate product, by-product, or final product of a petrochemical enterprise; if it is, the design shall be carried out in accordance with the \"Petrochemical Regulations,\" and if not, it shall be designed in accordance with the \"Construction Regulations.\" ; Third, quite often, design institutes tend to use the less stringent standard when designing ; Fourth, design in accordance with the specification applicable for acceptance at the location of the project.
Reply #32020-08-14
The contract will be inspected and evaluated in accordance with the specification specified for design. It has nothing to do with fees.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.