Old K writes every week – Insights into the petrochemical design industry, Post 23: Design specialty codes. Regarding design specialty codes, before the 2000s, Chinese pinyin abbreviations were generally used; as more projects abroad emerged, most companies gradually switched to English abbreviations, though there are still some differences among various companies. Common design specialty codes are listed in the table below: Table 23-1 Design Specialty Codes. Sequence Number, Specialty Name, Specialty Code, English Name of Specialty: 1. Process – PR; 2. Storage and Transportation – ST; 3. Water and Wastewater – WW; 4. Thermal Engineering – TM; 5. Health & Safety – HS; 6. Analysis – AN; 7. General Layout – GL; 8. Piping – PIP; 9. Pipe Materials – MAM; 10. Piping Stress Analysis – SAP; 11. Instrumentation – IN; 12. Telecommunication – TET; 13. Electrical – ELE; 14. Industrial Furnace – FU; 15. Equipment – EQ; 16. Machinery – MCM; 17. Architecture – AR; 18. Civil/Structural – CVC; 19. Heating, Ventilation and Air Conditioning – HV; 20. Environmental Protection – EP; 21. Budget Cost Estimation – BC; 22. Bulk Solid Material Handling – BS; 23. 3D Database Support – DS3D; 24. Project Management – PM; 25. Engineering Management – EM; 26. Project Secretary – PS; 27. Document Control – DC; 28. Planning – PL; 29. Cost Control – CC; 30. Quality Control – QC; 31. Project Accounting – PA; 32. Procurement – PC; 33. Construction – CN; 34. Commissioning – CM; 35. Information Systems – IT; 36. General – GE.

Lao K shares insights on matters related to the petrochemical design industry every week. For previous posts, please visit the following links: Post 1: The Development History of China’s Survey and Design Industry – https://bbs.hcbbs.com/thread-3031149-1-1.html; Post 2: Management in the Survey and Design Industry – https://bbs.hcbbs.com/thread-3036417-1-1.html; Post 3: The Development of Drawing Technologies in Design Institutes – https://bbs.hcbbs.com/thread-3039960-1-1.html; Post 4: The Evolution of Specialization within Petrochemical Design Institutes – https://bbs.hcbbs.com/thread-3045261-1-1.html; Post 5: The Organizational Structure of Petrochemical Engineering Companies – https://bbs.hcbbs.com/thread-3050591-1-1.html; Post 6: Contract Management in Design Management – https://bbs.hcbbs.com/thread-3054762-1-1.html; Post 7: Management of Design Basic Data in Design Management – https://bbs.hcbbs.com/thread-3058184-1-1.html; Post 8: Design Quality Management in Design Management – https://bbs.hcbbs.com/thread-3061718-1-1.html; Post 9: Design Schedule Management in Design Management – https://bbs.hcbbs.com/thread-3062161-1-1.html; Post 10: Design Document Management in Design Management – https://bbs.hcbbs.com/thread-3069580-1-1.html; Post 11: Meeting Management in Design Management – https://bbs.hcbbs.com/thread-3073327-1-1.html; Post 12: Bonus Distribution Management in Design Management – https://bbs.hcbbs.com/thread-3077492-1-1.html; Post 13: The Construction Procedures for Petrochemical Projects – https://bbs.hcbbs.com/thread-3082708-1-1.html; Post 14: Illustrations of Process Specialty Design Content and Procedures – https://bbs.hcbbs.com/thread-3086849-1-1.html; Post 15: Explanations of PID Versions and PID Modification Management – https://bbs.hcbbs.com/thread-3091076-1-1.html; Post 16: Common Energy-Inefficient Designs in the Petrochemical Industry – https://bbs.hcbbs.com/thread-3095859-1-1.html; Post 17: Project Work Breakdown – https://bbs.hcbbs.com/thread-3100837-1-1.html; Post 18: Issues Related to Design Talent Training – https://bbs.hcbbs.com/thread-3105529-1-1.html; Post 19: A Brief Explanation of Pump NPSH – https://bbs.hcbbs.com/thread-3109916-1-1.html; Post 20: On Excessive Patent Applications – https://bbs.hcbbs.com/thread-3111855-1-1.html; Post 21: Pressure Drop and Energy Consumption of Control Valves – https://bbs.hcbbs.com/thread-3116754-1-1.html; Post 22: Names and Codes of Project Design Phases – https://bbs.hcbbs.com/thread-3121148-1-1.html
Reply #22020-11-20
Previously, the initial letters of the pinyin were used, but now they have been changed to the initial letters in English; the naming rules for each household are more or less the same.
Reply #32020-11-20
For professional code design, reference can also be made to Chapter 7.6 \"Design Document Coding\" in Volume 10 of the \"Practical Handbook of Project Management\" edited by Hu Deyin from Sinochem Engineering, which provides detailed information on this topic.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.