Thread Content
On September 20, the mechanical work for the project at Sinopec’s Tianjin Scientific Testing Base was completed. It is reported that the total investment in this project exceeds 1 billion yuan. Located in the Nangang Industrial Zone of Tianjin Economic Development Area, it covers an area of over 300 mu, with a total construction area of around 70,000 square meters. The project will include four research and pilot production platforms for low-carbon oil processing, high-end carbon materials, hydrogen energy and electrochemistry, as well as resource recycling; in addition, there will be two pilot production bases for special lubricants and petroleum products. Completion is expected by 2025. A responsible official from Sihua Fourth Construction Company said that since the start of the project, in the face of natural challenges such as the intense rainy season and extreme heat, as well as construction difficulties like a dense layout and intertwined underground pipelines, all parties involved have worked together with a united spirit and shared goal, enabling the full operation of water, electricity, gas, and ventilation systems and ensuring seamless integration throughout the entire process. All major project units have now entered the final stages and preparation for commissioning. At present, the project construction is progressing smoothly and in an orderly manner; safety, quality, and schedule are all under control, and the established tasks have been successfully completed.
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】International Leadership in Revolutionary Technologies for Dehydration through Coupled Reactions of Solid Materials 2698-2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Industry Forum)
I’ve learned it,, thank you, I’ve gained a lot!
【Ten Years of Rapid Development in Chemical Processing Equipment】The World’s First Methanol Dual-Fuel Ship with 9300 CEU Sets Sail from 2700 to 2025 https://bbs.hcbbs.com/thread-5701791-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2702-2025: Changzheng Aerospace’s self-developed \"Integrated Gas Flow Bed Technology for the Carbonization, Grinding, and Gasification of Aerospace Biomass\" released https://bbs.hcbbs.com/thread-5701844-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2702-2025: Changzheng Aerospace’s self-developed \"Integrated Gas Flow Bed Technology for the Carbonization, Grinding, and Gasification of Aerospace Biomass\" released https://bbs.hcbbs.com/thread-5701844-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2703-2025 Sets New Record for Domestic Unmanned Aerial Vehicles Powered by Liquid Hydrogen; First Test Flight of a Multi-rotor UAV Powered by Liquid Hydrogen Completed in China https://bbs.hcbbs.com/thread-5701856-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2707-2025 – Like it! Tianjin Petrochemical uses self-developed wall-crawling robots to overcome the challenges in inspecting pipelines at high heights https://bbs.hcbbs.com/thread-5701892-1-1.html (Source: Haichuan Chemical Industry Forum)