HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Explanations of specialized process terms in the chemical industry

2017-07-31View Original

Thread Content

This post was last edited by xzzgjxmf on 2017-8-3 at 16:17. What do terms like RTO, MTO, MVR, TPM, 6S mean, and what is the process involved?
Reply #22017-07-31
RTO (Regenerative Thermal Oxider, abbreviated as RTO) is a regenerative thermal oxidation furnace. The principle is to oxidize the organic compounds (VOCs) in exhaust gases at high temperatures into corresponding carbon dioxide and water, thereby purifying the exhaust gases
Reply #32017-07-31
MVR is the abbreviation for mechanical vapor recompression; it involves using the secondary steam generated by the evaporation system along with its energy, which is then compressed by a steam compressor to increase the enthalpy of that secondary steam. This compressed steam is fed into a cooling tower, where the cooling water in the tower circulates to preheat the material. An energy-saving technology that provides thermal energy to the evaporation system in this cyclic manner, thereby reducing the need for external energy sources. ----From Baidu Baike, it is also said to be multi-effect evaporation.
Reply #42017-08-01
This post was last edited by xzzgjxmf on 2017-8-1 06:33. 6S management and quality refer to the activities carried out at the production site regarding production factors such as materials, equipment, and personnel, in order to lay a solid foundation for the implementation of other management activities. 1) Sorting (SEIRI): Distinguish between items that are needed and those that are not; get rid of the unnecessary items completely and keep only those that are required. 2) Sorting (SEITON): Place the items that are needed in their designated positions and implement proper labeling. 3) Cleaning (SEISO): Remove dirt from production elements such as equipment and the surrounding environment to keep them clean. 4) Cleaning (SEIKETSU): Maintaining the state achieved through sorting, organizing, and cleaning; it is also referred to as the “3S” activities. 5) Discipline (SHITSUKE): Everyone must abide by the company’s rules and regulations and develop good work habits. 6) Safety (SAFETY): Work in accordance with operating procedures to prevent accidents.
Reply #52017-08-01
This post was last edited by xzzgjxmf on 2017-8-1 06:36. TPM and Total Employee Participation in Improvement: T stands for Total (involvement of all employees), P stands for Productive (productivity), and M stands for Maintenance. TPM refers to the practice where companies, across all departments including production, development, design, sales, and management – from top management down to frontline employees – participate in repeated small-team activities. The goal is to reach the limits of productivity, to establish a system that can prevent all forms of waste, and to create an efficient enterprise with zero failures, zero waste, and zero defects. It also aims to foster a culture of active improvement within departments and teams.
Reply #62017-08-01
TQM is probably related to quality management

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.