HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Signal cable for water pump electrical control cabinet

2018-08-27View Original

Thread Content

May I ask whether it is possible to use a single multi-core cable to transmit the control cables for starting, stopping, and monitoring the operating status of one pump, given that one electrical control cabinet is used to control two pumps?
Reply #22018-08-27
It’s better not to, as the start signal is powered by 220V, while the operating circuit operates at 24V; it’s best to keep them separate
Reply #32018-08-27
Those intended for the DCS cannot be combined; the electrical control cables used on-site had better also be shielded, as poor wiring can easily lead to interference
Reply #42018-08-27
It is best to separate DI/DO from AI/AO
Reply #52018-08-27
There will be interference; the relay for the status signal will keep flashing
Reply #62018-08-28
A multi-core cable can be used; if it’s all digital signals, that should work

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.