Process control PID problem

2019-04-04View Original

Thread Content

What does all this mean? What determines the specific settings? What is the principle? . I earnestly ask experts for guidance!
Reply #22019-04-05
It should be known that KP, TN, and TV are likely proportional-integral-derivative parameters, while ER HYS is probably the delay time for detecting error signals. There should be design specifications for the system. Is it the PCS7 system?
Reply #32019-04-14
It’s PCS7, and there’s no explanation either! I want to know how to set these up! !
Reply #42019-04-15
The specific meanings and usage of these parameters are all outlined in the module manual
Reply #52019-04-16
I also have a PCS7; I’ll give it to you as a reference.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.