HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Newbie seeking help

2019-07-31View Original

Thread Content

I don’t know how to make the pump shut down automatically after a certain amount of material has been measured using a scale; I’m new to this, so I hope experts can help me out.
Reply #22019-07-31
1. Stop the pump automatically based on quality; A weighing device is needed ; 2. Based on flow rate, there are devices with low flow rates (mass flow rate) ; 3. When pressure and flow rate are constant, it is possible to consider shutting down the pump at regular intervals.
Reply #32019-07-31
Provide the digital signal through a secondary meter
Reply #42019-09-02
A measuring device is necessary to send a signal to the PLC, which in turn sends a signal to the pump to control its start and stop.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.