HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seek help: Checklist for inspection and verification before activating the automatic control instrument system

2019-09-11View Original

Thread Content

According to Document No. 88 of 2013 issued by the Safety Supervision Department, it is necessary to conduct inspections and verifications before putting into use the instrument automation control systems in newly built (renovated or expanded) facilities as well as those in facilities undergoing major repairs; such inspections are also required before restarting an instrument automation system that has been out of use for a long time. Does anyone have this inspection checklist? I would also like to ask what the maximum period for which a system can remain out of use is
Reply #22019-09-12
The PSSR checklist will do!
Reply #32021-11-19
It’s a very simple file; the main parameters are all that’s needed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.