Thread Content
10 11 1. 2.1110 3. ж л
Stations 10 and 11 both have redundant main controllers, each with its own program. 1. If it is necessary to use the backup unit of one of these stations elsewhere, how can the program stored in it be removed? Should I not perform any deletion and just use it at the engineer station? 2. If I replace the spare unit at station 11 with one from station 10 to use as a spare unit, can I just plug it in directly? 3. My question might not be expressed clearly enough; it’s about how to move the controller that contains data to another location. Thank you to those who can help answer this
In operation mode? No operations have been performed; the algorithm can be cleared, or the power-loss protection switch can be turned off
Theoretically, I think it’s possible to plug it in first and then initialize the lower components, but the risk is too high
Of course, it should be done when the machine is shut down. 1. If the power-off switch isn’t pulled out, will the program be cleared? 2. If the backup unit from station 11 is connected to station 10 as a backup, will the program on station 10’s main unit be automatically synchronized? Will the program from station 11 be automatically cleared in that case? 3. If that doesn’t work, does it mean that when using it in another location, one must first connect station 11’s main controller, initialize it, and then connect station 10’s main controller? I’m not quite sure how to replace the controller with content inside it; I’d appreciate some advice from experts