HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions regarding instrument automation and control

2020-08-11View Original

Thread Content

When using a HART meter for loop testing, such as testing a pressure transmitter’s loop, it is required to connect an ammeter in series within that loop. The ammeter is connected in series within the pressure transmitter’s circuit, not in series with the HART meter and then connected to the two terminals of the pressure transmitter. Is my understanding correct?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.