Jinling Petrochemical sets a new record for the operation of key water-coal slurry equipment

2017-05-11View Original

Thread Content

On May 4, Gasification Unit B in Chemical Operations Department 1 was shut down as scheduled. The process burner of this unit operated continuously for 126 days, setting a new record for the operating duration of burners since the start-up of the coal water slurry plant; this figure also represents a leading level among similar plants in China. The water-coal slurry gasification unit in the First Chemical Engineering Department utilizes GE’s patented gasification technology. Its process burners are used in a high-temperature furnace at approximately 4.0 MPa (G) and 1300°C, and they have to withstand flame scouring, high-temperature thermal radiation, as well as the erosive effects of fast-moving materials; thus, the operating conditions are quite severe. At present, the average service life of burners in similar units in China is around 80 days. As a key device that determines the long-term operation of coal gasification units, the safe and stable long-term operation of process burners also reflects the overall level of management of the process equipment in such units. At the beginning of 2016, the Operations Department identified extending the service life of burners as a key approach to ensuring the long-term operation of the equipment and reducing maintenance costs. It established a specialized technical team that, with the guidance of the company’s Maintenance Department, adopted new burner heads and implemented comprehensive control over the entire process by focusing on monitoring usage, analyzing operational issues, and ensuring quality control in burner repairs. The Operations Department has established maintenance management files for each burner, detailing information such as the serial number, design parameters, material used, date of commissioning, and maintenance records. During the operation of the process burner, regular \"health\" checks are carried out by adjusting the burner’s operating parameters, analyzing the shape of the slag and the amount of residual carbon. The task force promptly follows up with analyses and evaluations to devise appropriate countermeasures ; After the burner was taken out of service, special meetings were held to summarize and analyze issues such as burner wear and refractory brick erosion, in order to continuously accumulate experience in its use. Through more than a year of unremitting efforts, the service life of the burners in the gasification furnace process has been continuously extended, while the stable operation rate of the facility and its overall economic efficiency have seen significant improvements. From January to April, Chemical Operations Department 1 achieved a profit of 40.58 million yuan.
Reply #22017-05-11
May I ask what the residual carbon content of your fine slag is?
Reply #32017-05-11
It’s truly remarkable that a single-nozzle water-coal slurry can enable the burner to operate continuously for 126 days. It is evident that Jinling Petrochemical has put a great deal of effort into the operation and management of its gasification furnaces, and has achieved very good results; here, I extend my congratulations to them. At the same time, I hope everyone will also discuss how to achieve a long service life for burners, just like at Jinling Petrochemical. Reply to earn wealth! !
Reply #42017-05-11
I’m not from Jinling Petrochemical; I’m not very familiar with it. I hope someone who knows more can provide some information in the future
Reply #52017-05-11
The load of a 4.0 furnace is probably not high.
Reply #62017-05-12
I think it’s not necessary to simply pursue the operational limits of a particular device; as long as maintenance can be carried out as planned, production can be ensured.
Reply #72017-05-12
I fully agree with what Kyr said – it’s better to avoid attempting extreme measures. After all, in chemical production, safety always comes first. Although the incident at Jinling Petrochemical is worth praising, it shouldn’t be blindly emulated. The longer equipment operates continuously, the greater the safety risks; following the planned schedule for regular inspections of the equipment is an important condition for ensuring safe and stable operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.