HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Zhongtai Coal Coking: Successful first ignition of the pure oxygen converter in the methanol project

2021-03-02View Original

Thread Content

Zhongtai Coal Coking: Successful First Ignition of the Pure Oxygen Converter in the Methanol Production Project Author/Source: Henan Energy and Chemical Industry Group Xinjiang Company Date: 2021-03-02 Clicks: 3 On February 26, the pure oxygen converter in Zhongtai Coal Coking’s 200,000-ton/year methanol production project was successfully ignited, marking a crucial step toward enabling the full operation of the project and the production of high-quality methanol. The pure oxygen converter is the core equipment in the conversion process, and its main task is to convert methane in the feed gas into hydrogen, carbon monoxide, and carbon dioxide – the gases necessary for synthesizing methanol. It features good safety in operation, a long service life, and stable conversion rates; it also has advantages such as no carbon black precipitation and the ability to discharge harmful substances at high altitudes. To ensure a flawless first operation, the company communicated in advance with the general contractor and the design team to develop a detailed operation plan. Special training sessions were held to address various details that might affect the operation, so that every employee could master the procedures thoroughly. At 22:00 that day, the relevant process parameters and various operational metrics of the pure oxygen converter reached the conditions necessary for oxygen cut-off. After conducting a final inspection on site, the process engineers allowed oxygen to mix with superheated steam and enter the pure oxygen converter, where it reacted violently with the coke oven gas introduced into the furnace. The temperature inside the furnace rose rapidly, indicating a successful first ignition of the pure oxygen converter – one day earlier than planned.
Reply #22021-03-03
At 22:00 that day, the relevant process parameters of the work units and the pure oxygen converter gradually met the conditions for cutting off oxygen; it should have been the conditions for supplying oxygen. Such a large company making such a basic mistake! ! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.