HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Selection issues for steam self-regulating valves in waste boilers

2020-07-08View Original

Thread Content

For waste boiler steam, is FO or FC more suitable for use on the official website valves and on-site vent valves? I would appreciate some guidance from the experts
Reply #22020-07-08
Where are you connecting this ground wire to? The vent valve is installed after the control valve that connects to the pipeline network; the connecting control valve is an air-shut valve, while the vent valve is an air-open valve. Our setup is done in this way for reference only; you can consider the reasons on your own without further explanation
Reply #32020-07-10
The second floor is correct; there’s not much to say about this
Reply #42020-07-15
Whether to choose an open-or-close valve depends on the process requirements – it is determined whether an open or closed state is required in the event of a power or gas outage (an emergency situation).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.