Thread Content
Project Name: Upgrade Project for the Coupled Process of Converting Coke Oven Gas into Methanol – Hydrogen Energy – Ammonia Synthesis at Shanxi Zhengwang Hydrogen Energy Technology Co., Ltd. Launch Date: March 12, 2026 Location: Shanxi Industry/Project Type: Chemicals and Pharmaceuticals/Fuel Processing such as Petroleum and Coal/Modern Coal Chemistry; New infrastructure and new industries/Hydrogen energy Project owner: Shanxi Zhengwang Hydrogen Energy Technology Co., Ltd. Total investment: 219.11 million yuan Current progress: Planning and feasibility study Construction site: Modern Coal Chemical Industry Park, Xiaoyi Economic Development Zone, Lüliang City, Shanxi Province (Nanyao Village, Wutong Town) Construction contents: Decommissioning of gas generation furnaces and their auxiliary equipment ; Carry out targeted modifications to the coke oven gas compressor, pre-compressor, synthesis compressor, and hydrogen compressor ; The feed gas centrifugal compressor and synthesis compressor were changed from being driven by motors to being driven by steam turbines, and one additional substation was added ; Replace the adsorbent and modify the pipelines in the PSA decarburization adsorption unit. Milestone: 2026-03-11. The project is currently going through preliminary procedures. (Planning and Feasibility Study)
【Ten Years of Great Development in Chemical Equipment】3034-2026: The world’s first fixed-bed copper-based catalyst process; East China University of Science and Technology and Chlor-Alkali Chemical Industry jointly overcome the challenge of recycling by-product hydrogen chloride. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715177 (Source: Haichuan Chemical Forum (HCBBS))
[3D Process Flow] Compilation post – useful for learning and understanding the process flow https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
【Common Issues in Haichuan Pipeline Design】--Calculation of Fluid Conveyance Pipelines https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715465 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3037-2026: China’s first independently designed and built large-scale integrated fracturing engineering vessel, the “Ocean Oil 696”, was delivered in Zhoushan, Zhejiang. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715229 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3038=2026: Shandong Energy’s independently developed aldehyde-based fragrance project fills a technical gap in China, reducing reliance on imports! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715785 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】China’s first 20,000-ton wet-process masterbatch production line was put into operation at Hei Mao in Jiangxi from 3039 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715864 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))