Thread Content
On June 30, the Gansu Provincial Department of Ecology and Environment released the acceptance status of the environmental impact report of the 100,000-ton green methanol production project of Zhongke Nengyuan Chemical (Gansu) Co., Ltd. The main project of this project mainly includes electrolysis water hydrogen production device, air separation oxygen production device, biomass gasification device, crude syngas purification device and PSA decarbonization device, methanol synthesis and distillation device, and auxiliary projects include biomass boiler room, machine repair shop, torch, comprehensive building, etc. ; Storage and transportation systems include biomass warehouses, methanol tank areas, hydrogen tank areas, etc. ; Public works include water supply and drainage systems, desalted water stations, laboratories, etc. ; Environmental protection projects include sewage treatment stations, general solid waste temporary storage, hazardous waste storage, etc. The biomass gasification technology of this project adopts the multi-oxygen combustion carbon dioxide biomass gasification technology of Beijing Kaimingyang Thermal Energy Technology Co., Ltd. The core of multi-oxygen combustion technology is to use pure oxygen as the combustion medium, which undergoes a strong oxidation reaction with the fuel to release heat. The flue gas produced by combustion is mainly composed of high-purity carbon dioxide gas, and the recovered carbon dioxide gas can be comprehensively utilized. Project OverviewProject Name: Construction unit of green methanol production project with annual output of 100,000 tons: Construction site of Zhongke Nengyuan Chemical (Gansu) Co., Ltd.: Minle Industrial Park Chemical Industrial Park South of Chemical Avenue and East of Jingshishi Road Construction Scale: Construct a 100,000t/a green methanol production device, supporting a 13,333Nm3/h electrolytic water hydrogen production device and a 30,000Nm3/h crude syngas biomass gasification device. Construction content: It mainly constructs 7 sets of gasification units (6 in use and 1 in standby), 1 set of crude syngas purification unit and conversion unit, 1 set of electrolytic water hydrogen production unit (48 units), 1 set of methanol synthesis and distillation unit, 1 air separation oxygen production unit, 1 18.5t/h biomass boiler, 1 set of sewage treatment facilities, and supporting facilities such as waste heat utilization boiler, public works, auxiliary projects, storage and transportation projects and environmental protection projects. total investment: The total investment is 1.05 million yuan, of which environmental protection investment is approximately 12.41 million yuan, accounting for 1.18%.
[Ten years of development of chemical equipment] 3182-2026 disruptive reconstruction, the industry’s first set of 5.5-meter tamping coke oven machinery and equipment intelligent upgrading and transformation project https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5725339 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))