HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Electrical Edition 20170508】

2017-05-08View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 6 wealth. Multiple-choice question: When the power grid is operating normally but the three-phase load is unbalanced, the vector sum of the three-phase currents passing through the zero-sequence current transformer of the leakage protector is ( ). A. Equal to zero B. Less than zero C. Greater than zero D. None of the above A
Reply #22017-05-08
When the power grid is operating normally but the three-phase load is unbalanced, the vector sum of the three-phase currents passing through the zero-sequence current transformer of the leakage protector is (A) A. equal to zero B. less than zero C. greater than zero D. none of the above

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.