Static grounding of system utility tunnels

2020-04-02View Original

Thread Content

I would like to ask fellow maritime professionals: If static electricity grounding is required for the pipe racks in petrochemical systems, and it’s not possible to find the plant-wide static electricity grounding network at the grounding points, how should this issue be resolved?
Reply #22020-04-02
Drive a set of grounding electrodes at the grounding point; as long as the grounding resistance value meets the requirements, it is acceptable
Reply #32020-04-08
May I ask what the required resistance value for the grounding electrode is? How deep does it generally need to be chiseled to meet the requirements? Is 3.3 meters deep below the floor level sufficient?
Reply #42020-04-08
It should not exceed 100 ohms, and the upper part of the grounding electrode should be 1 meter above the ground.
Reply #52020-04-09
In a situation like this, how far apart should a set of grounding electrodes be placed? Can’t we just set up one grounding electrode?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.