HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Electrical Engineering Question (2018.9.15)

2018-09-16View Original

Thread Content

This post was last edited by sdscj0122 on 2018-9-16 at 20:20. It contains exam questions from the \"Power Safety Work Procedures (Substation Specialization)\\" section, in the form of true or false questions, requiring answers indicating whether the statement is correct or incorrect. The anti-misoperation interlock device must not be disabled arbitrarily; any deactivation of such a device requires approval from the unit’s chief engineer ; When temporarily disabling the anti-lockout device, approval from the substation supervisor or the on-duty shift leader of the power plant is required, and it must be reactivated as soon as possible in accordance with the established procedures.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.