HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical Technology 2020-5-2

2020-05-02View Original

Thread Content

This post was last edited by sdscj0122 on 2020-5-3 08:58. Electrical – True or False questions based on the \"Power Safety Work Procedures\". Please indicate whether the answer is correct or incorrect; 3 points for a correct answer, 2 points for an incorrect one. A detailed explanation of the reason is worth 5 points. Switching operations shall be ordered by the grid dispatcher or the shift supervisor (person in charge of operation) according to the respective authority over the equipment, and shall be carried out after the recipient repeats the order to confirm its accuracy. Commands should be accurate and clear, using standard operational terminology as well as the dual names of the equipment (i.e., the equipment name and its number). ()Correct

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.