To what extent are the drawings reviewed by three parties?

2020-05-07View Original

Thread Content

To what extent are the drawings typically developed in a tripartite review? From the drawings provided by the design institute, the electrical section includes plans for lighting, emergency lighting, sockets, low-power equipment, and lightning protection and grounding; there are also diagrams for the lighting and low-power systems. As for the instrumentation section, there is only a layout plan for the gas detector. Is that all there is to the tripartite review? I hope the seniors can offer some guidance. Thank you so much!
Reply #22020-05-14
More or less; what other drawings do you need?
Reply #32020-05-14
In the case of combustible gas detectors, there is usually also an explosion zone map
Reply #42020-05-14
That’s all for the building electrical construction drawings; there might also be an automatic fire alarm system (but it’s not mandatory)
Reply #52020-05-15
The drawings we received show it placed in telecommunications...

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.