HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical Technology 2020-6-10

2020-06-10View Original

Thread Content

This post was last edited by sdscj0122 on 2020-6-10 09:00. It deals with multiple-choice questions related to the \"Power Safety Work Procedures\"; please indicate whether the answer is correct or incorrect. 3 points are awarded for correct answers, 2 points for incorrect ones, and 5 points are required for a detailed explanation of the reasons. In emergency situations where it is necessary to disable the error-prevention locking devices temporarily in order to carry out operations, approval must be obtained from the factory leader in charge of production (or the chief engineer), and such devices should be reactivated as soon as possible in accordance with the established procedures. ()Error
Reply #22020-06-10
Error. Explanation: In emergency situations, when it is necessary to disable the anti-error locking device for quick operation, approval from the on-duty shift supervisor is required, and the device must be reactivated as soon as possible in accordance with the established procedures. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.