This post was last edited by sdscj0122 on 2020-6-17 at 08:47. True or False questions based on the “Safety Work Procedures for Electricity”. Please answer with either “correct” or “incorrect”. A correct answer earns 3 points, while an incorrect answer earns 2 points. Providing a detailed explanation of the reason earns 5 points. 69. When additional tasks need to be added within the area covered by the work order’s power outage restrictions, and if there is no need to change the scope of the safety measures, the person in charge of the work can directly add those tasks to the original work order. ( ) Incorrect
Error Solution: According to the Electrical Safety Work Procedures, when additional tasks need to be carried out within the area covered by the work order, and if there is no need to change the scope of safety measures, the person in charge of the work must obtain consent from the person who issued the work order and the person who granted the work permit, before adding those tasks to the original work order; If it is necessary to modify or add safety measures, a new work order should be filled out.
Error. When additional tasks need to be added within the area covered by the work order’s power outage restrictions, and if there is no need to change the scope of safety measures, the person in charge of the work shall obtain the consent of the work order issuer and the work permit issuer before adding the new tasks to the original work order.