【Q&A Question 342】December 26, 2017: Causes of converter tube penetration and corresponding treatment methods. Reason: ① Defects in the material itself. ②There are problems with the welding joints during construction. ③Local overheating causes burn-through. ④The service life of the furnace tube is approaching its end. Action: Stop operations. (Unless otherwise specified, all questions and answers are based on hydrogenation units.) ) For management purposes, if you need to view content from a few days ago, please go through the summary post below. 2017 Q&A Summary Thread (updates have begun) https://bbs.hcbbs.com/thread-1657793-1-1.html 2017 Daily Question Summary Thread (updates have begun) https://bbs.hcbbs.com/thread-1657794-1-1.html 2017 Daily Image Summary Thread https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1875160 2017 LNG Version Daily Question Catalog https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1804162 2016 Q&A Summary Thread (updates completed) https://bbs.hcbbs.com/thread-1597792-1-1.html
Reply #22017-12-26
High-temperature operation and short-term localized overheating are the direct causes of high-temperature creep failure in furnace tubes
Reply #32017-12-26
The material itself has defects, there are issues with the welding joints, local overheating has caused burn-through, and the furnace tube is nearing the end of its service life. Shut down for maintenance.
Reply #42017-12-26
Excessive furnace temperature, improper water-to-carbon ratio, and uneven flame combustion; in such cases, an emergency shutdown is the only option after penetration occurs
Reply #52017-12-26
①The material itself has defects. ②There are problems with the welding joints during construction. ③Local overheating causes burn-through. ④The service life of the furnace tube is approaching its end. Action: Stop operations.
Reply #62017-12-26
①The material itself has defects. ②There are problems with the welding joints during construction. ③Local overheating causes burn-through. ④The service life of the furnace tube is approaching its end. Treatment: Stop operations
Reply #72017-12-26
①The material itself has defects. ②There are problems with the welding joints during construction. ③Local overheating causes burn-through. ④The service life of the furnace tube is approaching its end. Treatment: Stop operations
Reply #82017-12-26
Reason: Imbalanced water-to-carbon ratio; The furnace temperature is too low, resulting in carbon buildup ; Long usage time, exceeding the service life ; Due to issues with the raw material pretreatment system, the sulfur content and olefins in the raw materials exceed the specified limits
Reply #92017-12-26
①The material itself has defects. ②There are problems with the welding joints during construction. ③Local overheating causes burn-through.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.