【Q&A Question 013】January 13, 2018: What is the purpose of filling the distillation system with N2? Using N2 filling enables safe and reliable airtight sealing, purging, and cleaning of related equipment and pipelines ; It can be used as an air seal to prevent contact between air and oil, as well as contact with related equipment, thereby ensuring safety ; Pressurizing at startup can accelerate the increase in system pressure, achieve liquid level balance, and shorten the startup adjustment time. (Unless otherwise specified, all questions and answers are based on hydrogenation units.) ) Due to the limitations on the number of posts in the “One Question per Day” section, “One Image per Day” has been moved to the registered devices section; you can access it through the directory I posted. Click me to access liuquan1100’s post topic directory, where you can find the daily questions I posted. For management reasons, if you want to view content from a few days ago, please use the summary post below to do so. 2018 Chemical Engineering Technology Training – Daily Question Summary Thread: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1888971
2018 Registered Equipment Section – Daily Image Summary Thread: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1888970
2018 Hydrogen Production and Hydrogenation Technology Section – Q&A Summary Thread: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1888968
2018 LNG Technology Discussion Section – Daily Question Summary Thread: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1888973
2017 Q&A Summary Thread (updates have started): https://bbs.hcbbs.com/thread-1657793-1-1.html
2017 Daily Question Summary Thread (updates have started): https://bbs.hcbbs.com/thread-1657794-1-1.html
2017 Daily Image Summary Thread: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1875160
2017 LNG Section – Daily Question List: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1804162
2016 Q&A Summary Thread (all updates completed): https://bbs.hcbbs.com/thread-1597792-1-1.html
Reply #22018-01-13
Establish pressure in the tower; use the pressure difference to push the medium into the next container (usually no bottom pump is used)
Reply #32018-01-13
Using N2 can ensure safe and reliable airtight sealing, as well as the purging of related equipment and pipelines; it can serve as an air seal to prevent contact between air and oil products as well as with related equipment, thereby ensuring safety. Pressurizing the system at the start-up stage can accelerate the increase in system pressure and achieve liquid level equilibrium, thus reducing the time required for startup adjustments.
Reply #42018-01-13
Using N2 filling enables safe and reliable airtight sealing, purging, and cleaning of related equipment and pipelines; It can be used as an air seal to prevent contact between air and oil, as well as contact with related equipment, thereby ensuring safety ; Pressurizing at startup can accelerate the increase in system pressure, achieve liquid level balance, and shorten the startup adjustment time.
Reply #52018-01-13
What is the purpose of filling the distillation system with N2? Using N2 filling enables safe and reliable airtight sealing, purging, and cleaning of related equipment and pipelines ; It can be used as an air seal to prevent contact between air and oil, as well as contact with related equipment, thereby ensuring safety ; Pressurizing at startup can accelerate the increase in system pressure, achieve liquid level balance, and shorten the startup adjustment time.
Reply #62018-01-13
Using N2 can enable safe and reliable airtight sealing, purging, and cleaning of related equipment and pipelines; it can serve as an air seal to prevent contact between air and oil products as well as with the relevant equipment, thus ensuring safety; pressurizing the system at the start-up stage can accelerate the increase in system pressure.
Reply #72018-01-13
Nitrogen sealing to prevent oxidation of the oil by contact with oxygen
Reply #82018-01-13
Using N2 filling enables safe and reliable airtight sealing, purging, and cleaning of related equipment and pipelines; It can be used as an air seal to prevent contact between air and oil, as well as contact with related equipment, thereby ensuring safety ; Pressurizing at startup can accelerate the increase in system pressure, achieve liquid level balance, and shorten the startup adjustment time.
Reply #92018-01-13
Ensure a safe and reliable airtight sealing, as well as the purging of relevant equipment and pipelines; It can be used as an air seal to prevent contact between air and oil, as well as contact with related equipment, thereby ensuring safety ; Pressurizing at startup can accelerate the increase in system pressure, achieve liquid level balance, and reduce the startup adjustment time
Reply #102018-01-13
Using N2 can enable safe and reliable airtight sealing, purging, and cleaning of related equipment and pipelines; it can serve as an air seal to prevent contact between air and oil products as well as with the relevant equipment, thus ensuring safety; pressurizing the system at the start-up stage can accelerate the increase in system pressure.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.