HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with the primary and secondary legs of the cyclone separator in the s zorb regenerator

2018-05-07View Original

Thread Content

This post was last edited by Internet Invisible Man on 2018-6-2 09:30. Since the loading process of the regenerator can cause the adsorbent to leak out through the material legs, why not install flap valves at the bottom of both the primary and secondary material legs to prevent such leakage?
Reply #22018-05-08
The feed rate at the primary leg is too high, which makes it easy for the designed flap valve to get clogged

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.