HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why is a top burner installed in the hydrogen production converter?

2022-01-12View Original

Thread Content

Why is a top burner installed in the hydrogen production converter?
Reply #22022-01-16
In the same direction as the material inside the furnace tube, this allows for better heat absorption by the material, reduces fuel consumption, and at the same time enables a reduction in the height of the convection section as well as the height at which the steam drum is installed
Reply #32022-03-08
The company specializes in the research, development, production, sales, and maintenance of systems and equipment related to \"temperature detection, visual perception, composition analysis, gas detection, and intelligent information technology.\" For petrochemical companies, it provides video flame monitoring and flame-out alarm systems for heating furnaces, as well as real-time online temperature monitoring and analysis systems for high-temperature furnace tubes, gas detection systems, and infrared thermal imaging temperature measurement systems. Feel free to contact me if you need any information?? Zhu Jiacun, 13696518235 (the same number on WeChat). For high-temperature furnaces such as hydrogen production furnaces, delayed coking units, and ethylene cracking furnaces, it is advisable to consider using an online temperature monitoring system for the furnace tubes, as this can help determine the degree of coking in the tubes as well as provide alerts in case of overheating.
Reply #42022-03-11
To recover more heat from the flue gas, a large number of plate heat exchangers need to be installed in the convection section. Moreover, the large number of plate heat exchangers installed on the ground facilitate overall layout and maintenance

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.