Problem of rising system pressure in sulfur plant

2018-09-19View Original

Thread Content

During the commissioning and heating-up phase of the sulfur plant system, the system pressure was normal. However, after switching to acidic gas, the system pressure did not decrease but instead rose immediately. Please help analyze the reason for this. . Thank you! ! (The gas flow rate into the furnace during heating is 5,000 cubic meters per hour) ; The total gas flow rate entering the furnace after the introduction of acidic gas is 2800 cubic meters per hour
Reply #22018-09-19
First is the process issue: during furnace heating, the process involves a chimney with negative pressure, while during operation the normal process is followed, and there is a pressure drop in the reactors. Secondly, there may be an issue with the air distribution, which leads to carbon deposition. This might not be apparent during the drying stage, but as the dryer operates, carbon accumulates in the bed layer, causing the system pressure to rise. Another issue is the poor sulfur discharge, which leads to sulfur accumulation in the system.
Reply #32018-09-21
The analysis upstairs makes quite a lot of sense. Personally, I believe the main reason is the liquid sulfur discharge system; in particular, when new units are put into operation, the pipelines are prone to clogging, which often leads to an increase in system pressure. It is recommended to check the discharge of liquid sulfur.
Reply #42018-09-21
It happens in normal circumstances. If it is the first time driving, it is due to design reasons or operational issues, such as valves not being installed in the required position or not being in the right place. The device is not thoroughly purged, etc. The issue with older devices is sulfur residue, which occurs when the hot standby state is not fully established. Investigate from multiple aspects
Reply #52018-09-24
Good, check if the valve has a flow limit.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.