I’m seeking advice from experts: When applying a new technological process to build China’s first demonstration facility, what are the special considerations regarding project approval? What are the requirements in terms of the facility’s scale, investment, as well as safety and environmental assessments? Thank you all! ! !
Pilot and pilot-scale tests are required, in compliance with the three simultaneities principle.
There are no special requirements; it follows the main stages of basic project construction: the project proposal stage, the feasibility study report stage, the preliminary design document stage, the construction drawing design stage, the construction preparation stage, the construction implementation stage, the completion acceptance stage, and the post-evaluation stage.
It is approved in accordance with the normal project construction process, with no special circumstances.
Conduct process safety and reliability analysis assessments.
The normal construction procedures are the same as those for building engineering projects. The only thing to note is that the safety supervision agencies and environmental protection departments are reluctant to approve projects with uncertain risks; therefore, it is necessary to invite relevant domestic experts as well as local leaders to jointly organize an expert review meeting in order to obtain expert opinions. This way, your procedures will proceed more smoothly.