HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Several common indicators used for quantifying equipment management assessment

2018-01-10View Original

Thread Content

  Some factories feel upset when they see the maintenance staff often idle, drinking tea, smoking, and resting. The idea was to evaluate maintenance staff based on the amount of work they performed, but it had the opposite effect. The equipment repaired by maintenance staff always leaves problems and side effects; new repair tasks keep arising, and the maintenance staff end up as busy as firefighters. As a result, the condition of the equipment worsens, and the production losses caused by downtime increase further. How to evaluate the performance of maintenance organizations becomes another complex and worthy of study issue. The system is like a ball: if one side is flattened, it bulges out on the other side. It is very helpful for factory managers to be aware of these key performance indicators, as they assist in evaluating and driving progress in equipment management. Taylor said over 100 years ago that a system without measurement finds it difficult to progress).   I. Equipment integrity rate This is the most commonly used of these indicators, but its role in facilitating management is limited. The so-called availability rate refers to the ratio of devices in good condition to the total number of devices during inspection (Availability Rate = Number of devices in good condition/Total number of devices). Many factories manage to achieve an availability rate of over 95%. The reason is simple: at the time of inspection, if the device is running and not malfunctioning, it is considered to be in good condition, so this indicator shows a good value. If it looks good, that means there isn’t much room for improvement; it means nothing can be improved further, and it also means it’s difficult to make progress. To this end, many companies have proposed modifying the definition of this indicator; for example, they suggest conducting inspections on the 8th, 18th, and 28th of each month, and using the average of the good rate values obtained from these inspections as the good rate for that month. This is of course better than checking once, but it still represents a good rate on a point-by-point basis. Later, it was proposed to use the number of productive hours divided by the total calendar working hours; the productive hours are equal to the total calendar working hours minus the total time spent on failures and their repairs. This indicator needs to be as accurate as possible. Of course, there are again issues related to the increased workload in statistics and the accuracy of those statistics, as well as debates over whether to deduct costs when it comes to preventive maintenance. Whether the uptime rate is an effective indicator of equipment management depends on how it is applied; different people may have different opinions on this.   II. Equipment failure rate This metric is easy to confuse, as there are two definitions: 1. If it refers to the failure frequency, it is the ratio of the number of failures to the actual number of times the equipment was in operation (Failure frequency = Number of failures due to downtime / Actual number of operating hours of the equipment) ; 2. If it is the failure downtime rate, then it is the ratio of the time the equipment is down due to failures to the sum of the time the equipment is actually in operation and the time it is down due to failures (Failure Downtime Rate = Time down due to failures / (Time actually in operation + Time down due to failures)). Clearly, the failure downtime rate can reflect the actual condition of the equipment more accurately.   III. Equipment availability  This concept is widely used in the West, while in China there are two different terms: planned time availability (planned time availability = actual working time/planned working time) and calendar time availability (calendar time availability = actual working time/calendar time). By definition, the availability rate as defined in the West is actually the calendar time utilization rate. Calendar time utilization reflects the full extent of equipment utilization; in other words, even for equipment that operates on a single shift basis, we calculate the calendar time based on 24 hours. Because whether the factory uses this equipment or not, it still consumes the company’s assets in the form of depreciation. The planned time utilization rate reflects the planned usage level of the equipment; in the case of single-shift operation, the planned time is 8 hours.   IV. Mean Time Between Failures (MTBF) of the equipment Another way of expressing this is as the average time the equipment operates without failure (MTBF = total time the equipment operates without failures during the statistical period / number of failures). It reflects the frequency of failures, that is, the health status of the equipment, in a complementary manner to the failure downtime rate. It is sufficient to use one of the two indicators; there is no need to measure something using related indicators. Another indicator reflecting maintenance efficiency is the Mean Time To Repair (MTTR) (Mean Time To Repair = Total time spent on repairs during a statistical period / Number of repairs), which measures the improvement in the efficiency of maintenance work. With the advancement of equipment technology, it is difficult to determine a fixed value for maintenance time due to factors such as the complexity of the equipment, the difficulty of repairs, the location of faults, the average skill level of maintenance technicians, and the age of the equipment. However, we can use these factors to assess its average performance and levels of improvement.   V. Overall Equipment Effectiveness OEE An indicator that provides a comprehensive reflection of equipment efficiency; OEE is the product of availability, performance, and quality factors. Just like a person, the time utilization rate represents the attendance rate; the performance utilization rate indicates whether one works hard after starting work and achieves the desired efficiency; the quality rate reflects the effectiveness of the work, showing whether mistakes are made frequently and whether tasks can be completed with both quality and quantity met. The simple formula for OEE is: Overall Equipment Effectiveness OEE = Output of qualified products / Theoretical output for the planned working time.   VI. Totally Effective Productivity TEEP The formula that best reflects equipment efficiency is TEEP, rather than OEE. True Effective Productivity TEEP = Output of qualified products / Theoretical output based on calendar time; this indicator reflects various deficiencies in the systematic management of equipment, including upstream and downstream impacts, effects related to the market and orders, imbalances in equipment capacity, and unreasonable planning and scheduling. This indicator is usually very low, which doesn’t look good, but it is highly accurate.   VII. There are also relevant indicators reflecting maintenance and its management. Such as the first-pass quality rate for maintenance, the rework rate, and the maintenance cost ratio.   1. The one-time pass rate for maintenance quality is measured as the number of times the equipment after maintenance meets the product quality standards during a single trial run, divided by the total number of maintenance sessions. It is worth examining whether the factory uses this indicator as a performance metric for the maintenance team.   2. The repair rate is the total number of repairs performed after equipment maintenance divided by the total number of maintenance sessions. This reflects the maintenance quality more accurately.   3. There are many definitions and calculation methods for the maintenance cost ratio. One is the ratio of annual maintenance costs to the total annual output value; another is the ratio of annual maintenance costs to the total original value of assets for that year. Yet another is the ratio of annual maintenance costs to the total replacement cost of assets for that year, followed by the ratio of annual maintenance costs to the total net value of assets for that year. Finally, there is the ratio of annual maintenance costs to the total production costs for that year. The author believes that the last algorithm is more reliable. Even so, the magnitude of this repair cost rate figure does not tell us anything. Because equipment maintenance is a form of investment, and investment generates value and output. Insufficient investment and significant production losses affect output ; Of course, excessive investment is also not ideal; it is known as over-maintenance and represents a waste. Appropriate investment is ideal. Therefore, factories should explore and determine the optimal ratio of inputs. High production costs mean more orders and a greater workload, which in turn increases the load on the equipment and raises the need for maintenance. Making investments in the right proportions should be the goal that factories strive to achieve. With this benchmark in place, the further one deviates from this indicator, the less ideal it is.   VIII. Regarding spare parts management  There are also numerous indicators, among which the spare parts inventory turnover rate (Spare parts inventory turnover rate = Monthly cost of spare parts used / Average monthly value of spare parts inventory) is a relatively representative indicator. It reflects the liquidity of spare parts. If a large amount of capital is tied up in inventory, it will be reflected in the turnover rate. Another indicator reflecting spare parts management is the spare parts capital ratio, which is the ratio of the total funds allocated to spare parts to the total original value of the company’s equipment. This value varies depending on whether the factory is located in a central city, whether the equipment is imported, and the extent of the losses caused by equipment downtime. If the daily downtime cost of a device amounts to tens of millions of yuan, or if the failure poses serious risks to environmental pollution and human safety, and the lead time for obtaining spare parts is long, then a higher inventory level of such spare parts is necessary; otherwise, the capital investment associated with these spare parts should be kept as low as possible. There is an indicator that goes unnoticed by many, but which is extremely important in modern maintenance management: the intensity of maintenance training (Intensity of maintenance training = hours spent on maintenance training / total hours worked). This training covers topics such as specialized knowledge of equipment structure, maintenance techniques, professional ethics, and maintenance management. This indicator reflects the degree of emphasis and investment companies place on improving the competence of their maintenance staff, and it also indirectly reflects the level of their maintenance technical skills.
Reply #22020-05-13
In fact, 90% of the units can’t do it; they basically only repair the parts that are broken, except for those larger devices

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.