HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Engineering Version] Daily Question 20180126

2018-01-26View Original

Thread Content

The most commonly used method for analyzing construction project costs is (  ).   A. Comparative method B. Factor analysis method C. Difference analysis method D. Ratio method Correct answer: B
Reply #22018-01-26
A. Comparative method B. Factor analysis method C. Difference analysis method D. Ratio method
Reply #32018-01-26
The most commonly used method for analyzing construction project costs is ( B ).   A. Comparative method B. Factor analysis method C. Difference analysis method D. Ratio method

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.