Judgment: The first floor of multi-story buildings should be calculated based on the horizontal area of the structure’s perimeter above the exterior wall plinth. () Answer: Correct. The first floor of multi-story buildings should be calculated based on the horizontal area of the structure’s perimeter above the base of its exterior walls ; Floors on the second floor and above shall be calculated based on the horizontal area of the perimeter of their exterior wall structure. Areas with a ceiling height of 2.20 m or more shall have their full area calculated ; For areas with a ceiling height of less than 2.20 m, half of the area shall be calculated.
Reply #22018-05-22
Error: The first floor of multi-story buildings should be calculated based on the horizontal area of the structure above the exterior wall plinth. (X)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.