What are the old facilities in enterprises that produce or use hazardous chemicals? How should risk management be carried out?

2026-04-07View Original

Thread Content

In June 2024, the Ministry of Emergency Management, the Ministry of Industry and Information Technology, the State-owned Assets Supervision and Administration Commission of the State Council, and the State Administration for Market Regulation jointly issued the \"Notice on the Issuance of Relevant Guidelines\" (Emergency No. 49), requiring the gradual phasing out of old chemical processing facilities. So what are old chemical processing plants? In accordance with the \"Guidelines for Safety Risk Assessment of Old Equipment in Enterprises Producing and Using Hazardous Chemicals\" (provisional), the old equipment referred to in these guidelines are those in enterprises that hold permits for the safe production and use of hazardous chemicals, and which involve major hazard sources, hazardous chemical processes under strict supervision, toxic gases, and explosives. Such equipment includes primary reactors, pressure vessels, atmospheric storage tanks, cryogenic storage tanks, and pressure pipelines of GC1 grade, where the design service life has been reached, or where no design service life has been specified but the actual operating time exceeds 20 years – including both standalone units and combined units. There are several conditions for being classified as an old chemical processing unit: 1. The enterprise holds a license for the safe production of hazardous chemicals or a license for the safe use of hazardous chemicals. 2. The enterprise is involved in any of major hazard sources, hazardous chemical processes under strict supervision, toxic gases, or explosives. 3. Any equipment or facility that has reached its designed service life, or for which no designed service life is specified, but whose actual operational time exceeds 20 years (including standalone units and combined units). As long as the above conditions are met, it can be classified as an old chemical plant facility. After being classified as an old chemical plant facility, it is necessary to determine its risk level. There are also four scenarios: 1. If any of the veto conditions apply, the entity should be eliminated. 2. Immediate corrective actions shall be taken for high-risk installations; safety, equipment, and process management measures shall be improved one by one, automated control and monitoring systems shall be upgraded, and operations that do not meet safety requirements shall be suspended for rectification. 3. Devices with higher safety risks. Rectification must be carried out immediately or within a specified time limit. 4. Devices with general and lower security risks. Implement regular control measures and carry out rectifications in line with inspection and maintenance plans to ensure that safety risks remain under control.
Reply #22026-04-07
【Ten Years of Rapid Development in Chemical Equipment】Successful first-commissioning of China Petrochemical’s 300,000 tons/year CHP-based propylene oxide (S-APO) production facility in 2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716975 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32026-04-07
【HaiChuan Equipment Guessing Game】How big a pot is needed to wash all these dishwashing balls? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717061 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-07
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The pneumatic valve supply line not sealed with a seal https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717224 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-07
【Ten Years of Rapid Development in Chemical Equipment】China’s first and largest production line capable of producing 10,000 tons of polyhydroxyalkanoates (PHA) was built between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717057 (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-04-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, Changqing Oilfield developed China’s first \"integrated automated welding system for oil and gas field pipelines\". https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717357 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-04-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】3069–2026: The Space Exploration Initiative and Inner Mongolia Baofeng’s construction of China’s first cluster of electrolytic hydrogen production facilities installed outdoors https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717373 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-04-09
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Failure of Seals on Casing Used for Pipeline Passage Through Fire Dams https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717423 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.