After the unit comes to a temporary stop due to interlock activation, emergency shutdown, etc., restarting it is of crucial importance. This step is directly related to the stable operation of the equipment, the safety of personnel during operations, and the restoration of production order. Improper handling may easily lead to secondary accidents, resulting in safety risks and economic losses. Therefore, great importance must be attached to the management of restarting operations. It is essential to strictly adhere to scientifically sound and standardized procedures, and to avoid any blind or reckless actions. This will ensure that the startup process remains safe and under control, effectively preventing all kinds of safety hazards and enabling the facility to quickly and smoothly resume normal production. Thoroughly investigate the cause of the shutdown. After an interlock shutdown occurs, it is necessary to conduct a comprehensive review of the sources that triggered the interlock, the operating status of related equipment, the trends in process parameters, as well as historical operation records and SIS system logs. Special attention should be paid to identifying any direct causes such as excessive process parameters, equipment failures, incorrect instrument readings, or fluctuations in utility supplies. If the cause cannot be identified, it is necessary to organize technical personnel from fields such as process engineering, equipment, and instrumentation to conduct a joint analysis. Driving must not be resumed until the cause is identified. Driving must not be resumed until the cause is identified. Driving must not be resumed until the cause is identified. Science-based confirmation of conditions for resuming driving: 1. The cause of the stoppage has been thoroughly identified and corrected, measures to prevent such stoppages from occurring again have been put in place, and the operators are fully aware of the cause of the stoppage, the procedures taken to address it, and the precautions required to resume driving. 2. The mechanical equipment requiring restart has undergone comprehensive inspection and necessary commissioning. Units such as large-scale pumps and compressors are ready for startup, and the lubricating oil pressure meets the standard requirements ; The interlocking associated equipment itself and its auxiliary systems pose no safety hazards. 3. The process flow is correctly set, with all valves in the proper positions. 4. The process operation conditions meet the requirements for resuming operation. For example: (1) The reactor temperature and pressure are within safe limits for resumption, thereby preventing abnormalities such as overheating, coking, and blockages that could occur due to an attempt to resume operation too quickly ; (2) Before igniting the heating furnace, an explosive gas analysis of the furnace chamber must be conducted in accordance with the management guidelines for process heating furnaces; ignition is permitted only after the results are confirmed to be satisfactory ; (3) After the inert gas displacement is completed, the oxygen content or combustible gas concentration must meet the specified standards. 5. The supply capacity of the utility systems (such as water, electricity, steam, instrument air, etc.) meets the requirements for resuming operation. 6. The interlock protection system has been reset, and its relevant functions have been confirmed to be operating normally.
Reply #22026-01-06
【Ten Years of Great Development in Chemical Engineering Equipment】 From 2953 to 2025, Chengdu KENENG and other companies successfully developed the world’s first megawatt-scale fully liquid carbon dioxide energy storage unit, which has now been put into operation for power generation. https://bbs.hcbbs.com/thread-5710545-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #32026-01-06
【Haichuan Equipment Guessing Game】Why don’t these bicycles have wheels? People I know must be really great! https://bbs.hcbbs.com/thread-5710458-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-01-06
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-01-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2954 to 2025, Hengjiu Machinery has been engaged in research and development of carbon dioxide diaphragm compressors, which have contributed to the creation of the world’s first commercial supercritical carbon dioxide power generation unit, “Chao Tan Yi Hao”. https://bbs.hcbbs.com/thread-5710546-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-01-08
【Ten Years of Rapid Development in Chemical Equipment】2958-2025: Maoming Petrochemical becomes the first company in China’s petrochemical industry to have its extruders under status monitoring – the project was approved successfully. https://bbs.hcbbs.com/thread-5710592-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #72026-01-09
【Ten Years of Rapid Development in Chemical Processing Equipment】2959-2026 **Successful development of technology for keeping natural gas compressors operating without power interruption in pipeline systems** https://bbs.hcbbs.com/thread-5710632-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82026-01-09
【Ten Years of Great Development in Chemical Equipment】2960–2025: The largest domestic single-unit project for zero discharge of high-salinity wastewater – The Zero Discharge Treatment Project for High-Salinity Wastewater Containing Heavy Metals from Jinchuan Nickel and Cobalt (Phase I) has been put into operation. https://bbs.hcbbs.com/thread-5710636-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #92026-01-10
【Ten Years of Rapid Development in Chemical Processing Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #102026-01-10
【Ten Years of Rapid Development in Chemical Equipment】2962-2025: Tianyuan Company’s first domestic lignite carbonization experimental unit in Shenmu coal chemical industry has been successfully put into operation https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112026-01-10
【Ten Years of Great Development in Chemical Engineering Equipment】2964-2026 The complete set of technologies for producing ABS via the bulk polymerization method developed by Dalian University of Technology has been successfully applied at Jilin Petrochemical. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.