HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Ocean Chemical Valve Management] Series Sticker TSG92-2026: Archival information requirements for explosive discs

2026-06-01View Original

Thread Content

Good management of valves is the basis for stable operation. Welcome everyone to communicate, discuss and share [Ocean Chemical Valve Management] series of posts. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719309 ----------------------------------------------------------------Disclaimer: The content contained in this article is for technical communication and reference purposes only and does not constitute any form of professional engineering advice, design basis or operating guidance. ----------------------------------------------------------------------------------- The mistake we often make is that we don’t know what the archives of explosive discs are, so we think it’s enough to have a certificate? I thought it would be enough to have an instruction manual? This article introduces the factory information and safety technical file requirements for bursting discs, and tries to collect them as completely as possible. E.3.5 Rupture disc factory information When delivering the product, the manufacturer shall provide at least the following information with the product:: (1) Product certificate ; (2) Assembly diagram of bursting disc device ; (3) Instruction manual ; (4) Product quality certificate (provided to users according to batch) ; (5) Relevant documents stipulated in the contract between the manufacturing unit and the user. E5 Usage Management E5.1 Safety Technology Files The user of the bursting disc device may use electronic information methods to track and manage the safety technology files. The retention period of the safety technology files shall not be less than the service life of the bursting disc device. Safety technical files should include the following contents: (1) Rupture disc device product quality certification documents and installation instructions ; (2) Regular self-inspection records and reports of bursting disc devices ; (3) Daily use records of bursting disc devices ; (4) Records of replacement of bursting disc devices or parts ; (5) Operational failures, accidents and maintenance records of bursting disc devices ; (6) The date of installation and use of the bursting disc device. Remark: The quality certificate includes at least the following contents: Product name, batch number, product model, manufacturing (batch) quantity, product specification (clamp code or nominal diameter of the relief port), material grade, material standard, applicable medium, applicable temperature, design bursting pressure, bursting pressure tolerance, bursting temperature, flow resistance coefficient (when applicable), manufacturing standards, qualification mark, seal of the inspector, signature or seal of the quality assurance engineer, name of the manufacturing unit, special equipment production license number, special inspection seal or official seal, and manufacturing date.
Reply #22026-06-01
During the installation of bursting discs, the replacement of bursting discs is often encountered during use. There have also been cases where the bursting discs were installed incorrectly. The arched direction of the bursting discs was installed in the opposite direction. Users complained. Be sure to strictly follow the installation instructions for correct installation. E4.2 Installation of bursting discs (1) After unpacking the bursting disc packaging box (box), check whether the bursting disc is damaged and whether there are traces of extrusion on the arch surface. Installation can only be carried out after confirming that there is no damage or extrusion. ; (2) The bursting disc device should be installed correctly in accordance with the requirements of the installation and operating instructions, and ensure that the discharge port is clear ; (3) After installing the holder into the clamping flange in the correct direction, the bolts of the clamping flange should be tightened evenly ; (4) The nameplate of the bursting disc device should be easy to read after installation. ; (5) When the discharge pipeline of the bursting disc device is long and has an impact on the clamping force of the bursting disc, measures should be taken to eliminate the impact of pipeline installation on the clamping force of the bursting disc. ; (6) If discharge collection pipes are used for multiple bursting disc devices, the cross-section of the collection pipe shall not be less than the sum of the minimum relief areas of all bursting disc devices that may be discharged at the same time. ; (7) During the installation process of the bursting disc device, the arch surface of the bursting disc must not be damaged, a sealing gasket must not be added between the bursting disc and the holder, and any repairs and processing on the holder are not allowed. ; (8) When the discharge pipeline of the bursting disc device is installed, the center line of the pipeline should be coaxial with the center line of the bursting disc device to avoid uneven stress on the bursting disc, causing the bursting disc to pull away or change the bursting pressure.
Reply #32026-06-01
After the rupture disc device is purchased and accepted at the factory, it is necessary to carefully check the relevant signs and nameplates to avoid the trouble of being found to be non-compliant with the standards after the product is used, causing the need for replacement or reissue. Those who read the mark electronically must remember to scan the code in person to confirm. In the past, the license to scan the QR code of the flange material book has expired, and rectification is very troublesome. E3.4 Marks and nameplates The bursting disc device manufacturing unit shall install a clear, permanent, traceable nameplate or electronic reading mark on each bursting disc and holder. Those who use electronic reading signs should meet the following requirements:: (1) The electronic reading mark set can be a QR code or a barcode, and should be directly engraved on the product body or nameplate to ensure that it cannot be replaced and can be effectively read during the service life of the bursting disc device. ; (2) If you choose to engrave the electronic reading mark directly on the product body, you should ensure that the engraving process will not affect the performance of the bursting disc device and it should be easy to view. ; (3) The bursting disc device manufacturing unit that chooses to install electronic reading marks shall be responsible for building its own bursting disc device product information disclosure platform and disclosing product manufacturing data batch by batch. The information data of each batch of products can be queried through mobile phone scanning. ; (4) The content of the electronic reading mark should be consistent with the content on the product nameplate. E3.4.1 Bursting disc nameplate The bursting disc nameplate shall include the following content: Special equipment production license number and logo, name or trademark of the manufacturing unit, model, date of manufacture, product number or batch number, material grade, manufacturing standards, specifications (or nominal diameter of the relief port), design bursting pressure, bursting pressure tolerance, bursting temperature, minimum relief area, flow resistance coefficient (when applicable), relief direction, and matching holder model or code. E3.4.2 Gripper nameplate The gripper nameplate shall include the following contents: Special equipment production license number and logo, name or trademark of the manufacturing unit, date of manufacture, product number or batch number, model or code number, material grade, specifications (or nominal diameter of the relief port), nominal pressure or pressure level, and relief direction.
Reply #42026-06-01
[Recommended articles by Haichuan] The Curse of Knowledge: The most hidden source of systemic risk in chemical engineering design https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722194 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #52026-06-02
[Talk about Haichuan Safety] Hidden dangers around you---the installation position and height of the thermometer do not meet the requirements https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722280 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #62026-06-03
[Ten years of development of chemical equipment] 3140-2026 International leader! Aerospace 6.5MPa, 4000-ton pulverized coal pressurized gasification technology passed the appraisal https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722153 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #72026-06-04
[Talk about Haichuan Safety] Hidden dangers around us - The floors of multi-story buildings with flammable liquid equipment have not taken measures to prevent flammable liquids from leaking to the lower floors. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722473 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #82026-06-05
[Ten years of development of chemical equipment] 3143-2026 The world’s first 50,000-ton carbon dioxide-based polypropylene carbonate (PPC) industrialized device was put into production https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722365 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #92026-06-05
[Frequently Asked Questions in Haichuan Pipeline Design] -- Understand the "four elements" of valve installation and avoid making modifications after three checks and four determinations! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722620 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))
Reply #102026-06-06
[Ten years of development of chemical equipment] 3145-2026 helps the first domestic long-distance green hydrogen transmission pipeline, CIMC Enric self-developed large-scale skid-mounted hydrogen pipeline compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5722375 (Source: Haichuan Chemical Forum (Huahaichuanliu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.