HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Enhanced calculation of flue ducts at the inlet and outlet of the flue gas desulfurization absorption tower

2017-10-27View Original

Thread Content

Question: How is the reinforcement for the rectangular inlet and outlet of an absorption tower calculated? What standards and specifications should be used?
Reply #22017-10-27
DLT 5121-2000 Technical Code for Design of Flue, Air and Coal Powder Pipelines in Thermal Power Plants – Supporting Design Calculation Methods

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.