HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues with using scaffolding inside the automatic bottom cover machine tower for inspection

2017-11-05View Original

Thread Content

This post was last edited by Refiner on 2017-11-5 at 14:32. An internal inspection of the coke tower is generally carried out every two years; with the introduction of automatic bottom cover machines, how should the scaffolding be set up? Entering from under the chute, where are the support points for that shelf?
Reply #22017-11-05
As long as we want to conduct an inspection and tell the scaffolder which area we need to check, they will set it up for us

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.