Introduction to Tower Internals Design: Dimension Calculation

2018-09-10View Original

Thread Content

This post was last edited by chryy on 2019-3-13 at 15:49. As the title suggests, after obtaining the hydraulic data related to the process, the designers responsible for the tower internals need to create drawings based on the opening rate of the trays. It is necessary to plan the opening rate of the distribution pipes as well as the proportion of the area occupied by the downcomers. Once the drawings are ready, it is also required to calculate the weight. This table provides preliminary calculation formulas for these four aspects, intended solely for those using it to understand trays or for those new to tray design work. The information presented here is quite basic; experts need not bother reading it. Updated on 2018-9-11: Added support for calculating component thickness and beam height, as well as improved calculations for downcomers. Although my knowledge is limited, it’s very suitable for beginners to practice with. I’m also a beginner; I’ll update the table again once I gain more experience or make any changes in practice. Feel free to stay tuned and discuss together; feel free to leave comments with any suggestions, and we can also explore any questions together.
Reply #22018-09-10
Many more contents will be added to 3088 in the future; a new version should be available within a week.
Reply #32018-09-12
The porosity formula was incorrect; it has been corrected - 2018-09-12
Reply #42018-09-25
This post was last edited by chryy on 2018-9-27 at 09:21. On 2018-09-25, the calculation of the composite porosity was improved; an error that resulted from improper simplification of the cross-sectional area of the tower and the area of the circular openings in the porosity calculation was corrected (the porosity value is correct; it was the simplification that led to errors in the areas of the openings and the tower’s cross-sectional area)
Reply #52018-10-08
Today, the requirements for various dimensional tolerances in the installation of tower internals are being updated; standard JBT1205-2001 is used as a reference. Since each tower is different, it is advisable to apply the same or higher requirements wherever possible.
Reply #62018-10-08
I’ve learned it! Great job, original poster~ Thanks for sharing

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.